They were still a work in progress through Spring 2017 since they were custom made for us from a local machine shop (note the missing pieces on the deck)
The next big item after the new deck was put in (note that we only did the back portion and we still need to do the front and side porch) we added a covered area to allow for some shade. Structure went up Spring 2017.
The boys loved seeing a crane in the yard lifting the pieces into place.
Changes the entire look! Just needs the roof at this point.
Stay tuned...
No comments:
Post a Comment